Horley, West Sussex RH6 0NP
Artel Scaffolding has successfully provided the scaffolding for Keltbray to carry out enabling works and the removal of a link bridge from Gatwick’s North Terminal. The scaffold was to enable the lifting chains to be secured around the steel beams, and the deconstruction of 40 tonnes of internal cladding and fire protection. The three bridges each weighed 42 tonnes and each measured 18 x 5 x 5 metres.